build: production build with Phase 1 2025 Bible Reader implementation complete
Includes all Phase 1 features: - Search-first navigation with auto-complete - Responsive reading interface (desktop/tablet/mobile) - 4 customization presets + full fine-tuning controls - Layered details panel with notes, bookmarks, highlights - Smart offline caching with IndexedDB and auto-sync - Full accessibility (WCAG 2.1 AA) 🤖 Generated with [Claude Code](https://claude.com/claude-code) Co-Authored-By: Claude <noreply@anthropic.com>
This commit is contained in:
346
IMPLEMENTATION_ROADMAP.md
Normal file
346
IMPLEMENTATION_ROADMAP.md
Normal file
@@ -0,0 +1,346 @@
|
||||
# Biblical Guide - Complete Implementation Roadmap
|
||||
|
||||
## 📋 Overview
|
||||
|
||||
This document provides a comprehensive roadmap for all planned features, organized by priority, with detailed timelines and resource allocation recommendations.
|
||||
|
||||
**Document Version:** 1.0
|
||||
**Last Updated:** 2025-10-13
|
||||
**Status:** Master Planning Document
|
||||
|
||||
---
|
||||
|
||||
## 🎯 Implementation Plans Created
|
||||
|
||||
### **🔴 High Priority - Phase 2 (8-10 weeks)**
|
||||
|
||||
| # | Feature | Estimated Time | Plan Document | Status |
|
||||
|---|---------|----------------|---------------|--------|
|
||||
| 1 | Text-to-Speech | 2-3 weeks | [TEXT_TO_SPEECH_IMPLEMENTATION_PLAN.md](./TEXT_TO_SPEECH_IMPLEMENTATION_PLAN.md) | ✅ Ready |
|
||||
| 2 | Parallel Bible View | 2 weeks | [PARALLEL_BIBLE_VIEW_PLAN.md](./PARALLEL_BIBLE_VIEW_PLAN.md) | ✅ Ready |
|
||||
| 3 | Cross-References Panel | 2 weeks | [CROSS_REFERENCES_PANEL_PLAN.md](./CROSS_REFERENCES_PANEL_PLAN.md) | ✅ Ready |
|
||||
| 4 | Export Functionality | 2-3 weeks | [EXPORT_FUNCTIONALITY_PLAN.md](./EXPORT_FUNCTIONALITY_PLAN.md) | ✅ Ready |
|
||||
|
||||
**Total Phase 2 Time:** 8-10 weeks
|
||||
|
||||
---
|
||||
|
||||
### **🟡 Medium Priority - Phase 2B (5-7 weeks)**
|
||||
|
||||
| # | Feature | Estimated Time | Plan Document | Status |
|
||||
|---|---------|----------------|---------------|--------|
|
||||
| 5 | Focus Mode Enhanced | 1 week | [FOCUS_MODE_ENHANCED_PLAN.md](./FOCUS_MODE_ENHANCED_PLAN.md) | ✅ Ready |
|
||||
| 6 | Rich Text Notes | 2 weeks | [RICH_TEXT_NOTES_PLAN.md](./RICH_TEXT_NOTES_PLAN.md) | ✅ Ready |
|
||||
| 7 | Tags & Categories | 1-2 weeks | [TAGS_CATEGORIES_SYSTEM_PLAN.md](./TAGS_CATEGORIES_SYSTEM_PLAN.md) | ✅ Ready |
|
||||
| 8 | Speed Reading Mode | 2 weeks | [SPEED_READING_MODE_PLAN.md](./SPEED_READING_MODE_PLAN.md) | ✅ Ready |
|
||||
| 9 | Custom Fonts & Dyslexia | 1 week | [CUSTOM_FONTS_DYSLEXIA_SUPPORT_PLAN.md](./CUSTOM_FONTS_DYSLEXIA_SUPPORT_PLAN.md) | ✅ Ready |
|
||||
|
||||
**Total Phase 2B Time:** 7-8 weeks
|
||||
|
||||
---
|
||||
|
||||
### **🔵 Future - Phase 3 (12-16 weeks)**
|
||||
|
||||
| # | Feature | Estimated Time | Plan Document | Status |
|
||||
|---|---------|----------------|---------------|--------|
|
||||
| 10 | AI Smart Suggestions | 4-6 weeks | [AI_SMART_SUGGESTIONS_PLAN.md](./AI_SMART_SUGGESTIONS_PLAN.md) | ✅ Ready |
|
||||
| 11 | Reading Analytics Dashboard | 3-4 weeks | 📝 To be created | ⏳ Pending |
|
||||
| 12 | Social & Collaboration | 4-6 weeks | 📝 To be created | ⏳ Pending |
|
||||
| 13 | Enhanced Offline Experience | 2-3 weeks | 📝 To be created | ⏳ Pending |
|
||||
| 14 | Advanced Search & Discovery | 2-3 weeks | 📝 To be created | ⏳ Pending |
|
||||
|
||||
**Total Phase 3 Time:** 15-22 weeks
|
||||
|
||||
---
|
||||
|
||||
## 📊 Complete Feature Matrix
|
||||
|
||||
### By User Impact & Complexity
|
||||
|
||||
```
|
||||
High Impact
|
||||
│
|
||||
Text-to-Speech │ Parallel View
|
||||
Cross-Refs │ Export
|
||||
─────────────────────────┼─────────────────────────
|
||||
Speed Reading │ AI Suggestions
|
||||
Analytics │ Social Features
|
||||
│
|
||||
Low Complexity → High Complexity
|
||||
```
|
||||
|
||||
### By Implementation Order (Recommended)
|
||||
|
||||
**Quarter 1 (Weeks 1-13)**
|
||||
1. Text-to-Speech (Weeks 1-3)
|
||||
2. Parallel Bible View (Weeks 4-5)
|
||||
3. Cross-References (Weeks 6-7)
|
||||
4. Export Functionality (Weeks 8-10)
|
||||
5. Focus Mode Enhanced (Week 11)
|
||||
6. Custom Fonts & Dyslexia (Week 12)
|
||||
7. Buffer/Testing (Week 13)
|
||||
|
||||
**Quarter 2 (Weeks 14-26)**
|
||||
1. Rich Text Notes (Weeks 14-15)
|
||||
2. Tags & Categories (Weeks 16-17)
|
||||
3. Speed Reading Mode (Weeks 18-19)
|
||||
4. Reading Analytics (Weeks 20-23)
|
||||
5. Advanced Search (Weeks 24-25)
|
||||
6. Buffer/Testing (Week 26)
|
||||
|
||||
**Quarter 3 (Weeks 27-39)**
|
||||
1. AI Smart Suggestions (Weeks 27-32)
|
||||
2. Enhanced Offline (Weeks 33-35)
|
||||
3. Social Features - Phase 1 (Weeks 36-39)
|
||||
|
||||
**Quarter 4 (Weeks 40-52)**
|
||||
1. Social Features - Phase 2 (Weeks 40-43)
|
||||
2. Polish & Optimization (Weeks 44-48)
|
||||
3. Marketing & Documentation (Weeks 49-52)
|
||||
|
||||
---
|
||||
|
||||
## 💰 Resource Requirements
|
||||
|
||||
### Development Team (Recommended)
|
||||
|
||||
**Option A: Single Developer**
|
||||
- Timeline: 52 weeks (1 year)
|
||||
- Cost: Varies by region
|
||||
- Pros: Consistent vision, lower coordination overhead
|
||||
- Cons: Longer timeline, no redundancy
|
||||
|
||||
**Option B: Small Team (2-3 Developers)**
|
||||
- Timeline: 26-30 weeks (6-7 months)
|
||||
- Frontend Developer
|
||||
- Backend Developer
|
||||
- UI/UX Designer (part-time)
|
||||
- Pros: Faster delivery, specialization
|
||||
- Cons: Higher cost, coordination needed
|
||||
|
||||
**Option C: Larger Team (4-6 Developers)**
|
||||
- Timeline: 13-20 weeks (3-5 months)
|
||||
- 2 Frontend Developers
|
||||
- 2 Backend Developers
|
||||
- 1 UI/UX Designer
|
||||
- 1 QA Engineer
|
||||
- Pros: Fastest delivery, parallel workstreams
|
||||
- Cons: Highest cost, more management overhead
|
||||
|
||||
### Technology Stack Requirements
|
||||
|
||||
**Infrastructure:**
|
||||
- PostgreSQL with pgvector extension (for AI features)
|
||||
- Redis (caching, sessions)
|
||||
- Cloud storage (S3/equivalent) for uploaded fonts, exports
|
||||
- CDN for static assets
|
||||
|
||||
**Third-Party Services:**
|
||||
- OpenAI/Azure OpenAI API (for AI features)
|
||||
- Amazon Polly or Google TTS (for premium voices)
|
||||
- Stripe (already configured)
|
||||
- SendGrid/Mailgun (already configured)
|
||||
|
||||
**Estimated Monthly Costs:**
|
||||
- Infrastructure: $50-200/month
|
||||
- AI Services: $100-500/month (depending on usage)
|
||||
- Storage/CDN: $20-100/month
|
||||
- **Total:** $170-800/month
|
||||
|
||||
---
|
||||
|
||||
## 🎯 Success Metrics
|
||||
|
||||
### Phase 2 Goals (Weeks 1-10)
|
||||
- ✅ TTS adoption: 20% of active users
|
||||
- ✅ Parallel view usage: 15% of sessions
|
||||
- ✅ Cross-reference clicks: 30% of verses viewed
|
||||
- ✅ Export usage: 10% of users
|
||||
|
||||
### Phase 2B Goals (Weeks 11-18)
|
||||
- ✅ Focus mode enabled: 25% of users
|
||||
- ✅ Notes created: Average 5 per active user
|
||||
- ✅ Tags used: 40% of highlights
|
||||
- ✅ Speed reading tried: 10% of users
|
||||
|
||||
### Phase 3 Goals (Weeks 19-39)
|
||||
- ✅ AI suggestions clicked: 30% relevance rate
|
||||
- ✅ Semantic search used: 15% of searches
|
||||
- ✅ Analytics viewed: Weekly by 50% of users
|
||||
- ✅ Social features: 20% engagement rate
|
||||
|
||||
---
|
||||
|
||||
## 🚀 Quick Start Guide
|
||||
|
||||
### For Developers
|
||||
|
||||
1. **Choose your starting feature:**
|
||||
- Highest user value: Text-to-Speech
|
||||
- Easiest implementation: Focus Mode Enhanced
|
||||
- Most complex: AI Smart Suggestions
|
||||
|
||||
2. **Review the plan:**
|
||||
- Read the full implementation plan
|
||||
- Check database schema requirements
|
||||
- Review API endpoints needed
|
||||
|
||||
3. **Set up environment:**
|
||||
```bash
|
||||
# Install dependencies (if new)
|
||||
npm install <required-packages>
|
||||
|
||||
# Update database schema
|
||||
npx prisma db push
|
||||
|
||||
# Run migrations
|
||||
npx prisma migrate dev
|
||||
```
|
||||
|
||||
4. **Follow the timeline:**
|
||||
- Each plan has a day-by-day breakdown
|
||||
- Build incrementally
|
||||
- Test continuously
|
||||
|
||||
### For Project Managers
|
||||
|
||||
1. **Resource allocation:**
|
||||
- Assign developers based on expertise
|
||||
- Frontend: React, TypeScript, Material-UI
|
||||
- Backend: Node.js, Prisma, PostgreSQL
|
||||
- Full-stack: Can handle both
|
||||
|
||||
2. **Sprint planning:**
|
||||
- Use 2-week sprints
|
||||
- Each feature = 1-3 sprints
|
||||
- Build buffer time (15-20%)
|
||||
|
||||
3. **Risk management:**
|
||||
- Identify blockers early
|
||||
- Have fallback options
|
||||
- Regular stakeholder updates
|
||||
|
||||
---
|
||||
|
||||
## 📈 Progress Tracking
|
||||
|
||||
### Template for Feature Implementation
|
||||
|
||||
```markdown
|
||||
## [Feature Name]
|
||||
|
||||
**Status:** Not Started | In Progress | In Review | Complete
|
||||
**Progress:** 0% → 100%
|
||||
**Start Date:** YYYY-MM-DD
|
||||
**Target Date:** YYYY-MM-DD
|
||||
**Actual Completion:** YYYY-MM-DD
|
||||
|
||||
### Milestones
|
||||
- [ ] Database schema updated
|
||||
- [ ] API endpoints implemented
|
||||
- [ ] UI components built
|
||||
- [ ] Testing complete
|
||||
- [ ] Documentation written
|
||||
- [ ] Deployed to production
|
||||
|
||||
### Blockers
|
||||
- None / [Description]
|
||||
|
||||
### Notes
|
||||
- [Any relevant notes]
|
||||
```
|
||||
|
||||
---
|
||||
|
||||
## 🔄 Continuous Improvement
|
||||
|
||||
### After Each Feature Launch
|
||||
|
||||
1. **Collect user feedback:**
|
||||
- In-app surveys
|
||||
- Usage analytics
|
||||
- Support tickets
|
||||
- Feature requests
|
||||
|
||||
2. **Measure success metrics:**
|
||||
- Adoption rate
|
||||
- Engagement
|
||||
- Performance
|
||||
- Error rates
|
||||
|
||||
3. **Iterate:**
|
||||
- Quick wins (bug fixes)
|
||||
- Medium improvements (UX tweaks)
|
||||
- Long-term enhancements (v2.0)
|
||||
|
||||
---
|
||||
|
||||
## 📚 Related Documentation
|
||||
|
||||
### Current Status Documents
|
||||
- [FEATURES_BACKLOG.md](./FEATURES_BACKLOG.md) - Original feature list
|
||||
- [SUBSCRIPTION_IMPLEMENTATION_STATUS.md](./SUBSCRIPTION_IMPLEMENTATION_STATUS.md) - Completed subscription system
|
||||
- [AI_CHAT_IMPLEMENTATION_COMPLETE.md](./AI_CHAT_IMPLEMENTATION_COMPLETE.md) - Completed AI chat
|
||||
|
||||
### Technical Documentation
|
||||
- Database schema: See Prisma schema file
|
||||
- API documentation: See individual route files
|
||||
- Component library: Material-UI v7
|
||||
|
||||
---
|
||||
|
||||
## ⚠️ Important Considerations
|
||||
|
||||
### Before Starting Any Feature
|
||||
|
||||
1. **Dependencies:**
|
||||
- Check if feature requires other features first
|
||||
- Verify all required packages are installed
|
||||
- Ensure database supports required features (e.g., pgvector for AI)
|
||||
|
||||
2. **User Impact:**
|
||||
- Will this affect existing users?
|
||||
- Do we need a migration strategy?
|
||||
- Should we use feature flags?
|
||||
|
||||
3. **Performance:**
|
||||
- What's the expected load?
|
||||
- Do we need caching?
|
||||
- Are there potential bottlenecks?
|
||||
|
||||
4. **Cost:**
|
||||
- Any new third-party services?
|
||||
- API usage costs?
|
||||
- Storage/bandwidth implications?
|
||||
|
||||
---
|
||||
|
||||
## 🎉 Conclusion
|
||||
|
||||
This roadmap provides a clear path from the current state to a fully-featured Bible study platform. Each implementation plan is production-ready and can be executed independently or in parallel (where dependencies allow).
|
||||
|
||||
**Total Estimated Timeline:**
|
||||
- **Fast Track (Large Team):** 3-5 months
|
||||
- **Moderate (Small Team):** 6-9 months
|
||||
- **Steady (Solo Developer):** 12-15 months
|
||||
|
||||
**Recommended Approach:**
|
||||
Start with **Phase 2 High Priority** features for maximum user impact, then expand to **Phase 2B** for enhanced experience, and finally implement **Phase 3** for advanced capabilities.
|
||||
|
||||
---
|
||||
|
||||
## 📞 Need Help?
|
||||
|
||||
For questions or clarifications on any implementation plan:
|
||||
1. Review the specific plan document
|
||||
2. Check the component code examples
|
||||
3. Refer to the API endpoint specifications
|
||||
4. Test with small prototypes first
|
||||
|
||||
**Good luck with the implementation! 🚀**
|
||||
|
||||
---
|
||||
|
||||
**Maintained by:** Development Team
|
||||
**Next Review:** After Phase 2 completion
|
||||
**Version:** 1.0
|
||||
Reference in New Issue
Block a user