Files
biblical-guide.com/IMPLEMENTATION_ROADMAP.md
Andrei 9b5c0ed8bb build: production build with Phase 1 2025 Bible Reader implementation complete
Includes all Phase 1 features:
- Search-first navigation with auto-complete
- Responsive reading interface (desktop/tablet/mobile)
- 4 customization presets + full fine-tuning controls
- Layered details panel with notes, bookmarks, highlights
- Smart offline caching with IndexedDB and auto-sync
- Full accessibility (WCAG 2.1 AA)

🤖 Generated with [Claude Code](https://claude.com/claude-code)

Co-Authored-By: Claude <noreply@anthropic.com>
2025-11-11 20:38:01 +00:00

9.8 KiB

Biblical Guide - Complete Implementation Roadmap

📋 Overview

This document provides a comprehensive roadmap for all planned features, organized by priority, with detailed timelines and resource allocation recommendations.

Document Version: 1.0 Last Updated: 2025-10-13 Status: Master Planning Document


🎯 Implementation Plans Created

🔴 High Priority - Phase 2 (8-10 weeks)

# Feature Estimated Time Plan Document Status
1 Text-to-Speech 2-3 weeks TEXT_TO_SPEECH_IMPLEMENTATION_PLAN.md Ready
2 Parallel Bible View 2 weeks PARALLEL_BIBLE_VIEW_PLAN.md Ready
3 Cross-References Panel 2 weeks CROSS_REFERENCES_PANEL_PLAN.md Ready
4 Export Functionality 2-3 weeks EXPORT_FUNCTIONALITY_PLAN.md Ready

Total Phase 2 Time: 8-10 weeks


🟡 Medium Priority - Phase 2B (5-7 weeks)

# Feature Estimated Time Plan Document Status
5 Focus Mode Enhanced 1 week FOCUS_MODE_ENHANCED_PLAN.md Ready
6 Rich Text Notes 2 weeks RICH_TEXT_NOTES_PLAN.md Ready
7 Tags & Categories 1-2 weeks TAGS_CATEGORIES_SYSTEM_PLAN.md Ready
8 Speed Reading Mode 2 weeks SPEED_READING_MODE_PLAN.md Ready
9 Custom Fonts & Dyslexia 1 week CUSTOM_FONTS_DYSLEXIA_SUPPORT_PLAN.md Ready

Total Phase 2B Time: 7-8 weeks


🔵 Future - Phase 3 (12-16 weeks)

# Feature Estimated Time Plan Document Status
10 AI Smart Suggestions 4-6 weeks AI_SMART_SUGGESTIONS_PLAN.md Ready
11 Reading Analytics Dashboard 3-4 weeks 📝 To be created Pending
12 Social & Collaboration 4-6 weeks 📝 To be created Pending
13 Enhanced Offline Experience 2-3 weeks 📝 To be created Pending
14 Advanced Search & Discovery 2-3 weeks 📝 To be created Pending

Total Phase 3 Time: 15-22 weeks


📊 Complete Feature Matrix

By User Impact & Complexity

                    High Impact
                         │
        Text-to-Speech   │   Parallel View
        Cross-Refs       │   Export
─────────────────────────┼─────────────────────────
        Speed Reading    │   AI Suggestions
        Analytics        │   Social Features
                         │
                    Low Complexity → High Complexity

Quarter 1 (Weeks 1-13)

  1. Text-to-Speech (Weeks 1-3)
  2. Parallel Bible View (Weeks 4-5)
  3. Cross-References (Weeks 6-7)
  4. Export Functionality (Weeks 8-10)
  5. Focus Mode Enhanced (Week 11)
  6. Custom Fonts & Dyslexia (Week 12)
  7. Buffer/Testing (Week 13)

Quarter 2 (Weeks 14-26)

  1. Rich Text Notes (Weeks 14-15)
  2. Tags & Categories (Weeks 16-17)
  3. Speed Reading Mode (Weeks 18-19)
  4. Reading Analytics (Weeks 20-23)
  5. Advanced Search (Weeks 24-25)
  6. Buffer/Testing (Week 26)

Quarter 3 (Weeks 27-39)

  1. AI Smart Suggestions (Weeks 27-32)
  2. Enhanced Offline (Weeks 33-35)
  3. Social Features - Phase 1 (Weeks 36-39)

Quarter 4 (Weeks 40-52)

  1. Social Features - Phase 2 (Weeks 40-43)
  2. Polish & Optimization (Weeks 44-48)
  3. Marketing & Documentation (Weeks 49-52)

💰 Resource Requirements

Option A: Single Developer

  • Timeline: 52 weeks (1 year)
  • Cost: Varies by region
  • Pros: Consistent vision, lower coordination overhead
  • Cons: Longer timeline, no redundancy

Option B: Small Team (2-3 Developers)

  • Timeline: 26-30 weeks (6-7 months)
  • Frontend Developer
  • Backend Developer
  • UI/UX Designer (part-time)
  • Pros: Faster delivery, specialization
  • Cons: Higher cost, coordination needed

Option C: Larger Team (4-6 Developers)

  • Timeline: 13-20 weeks (3-5 months)
  • 2 Frontend Developers
  • 2 Backend Developers
  • 1 UI/UX Designer
  • 1 QA Engineer
  • Pros: Fastest delivery, parallel workstreams
  • Cons: Highest cost, more management overhead

Technology Stack Requirements

Infrastructure:

  • PostgreSQL with pgvector extension (for AI features)
  • Redis (caching, sessions)
  • Cloud storage (S3/equivalent) for uploaded fonts, exports
  • CDN for static assets

Third-Party Services:

  • OpenAI/Azure OpenAI API (for AI features)
  • Amazon Polly or Google TTS (for premium voices)
  • Stripe (already configured)
  • SendGrid/Mailgun (already configured)

Estimated Monthly Costs:

  • Infrastructure: $50-200/month
  • AI Services: $100-500/month (depending on usage)
  • Storage/CDN: $20-100/month
  • Total: $170-800/month

🎯 Success Metrics

Phase 2 Goals (Weeks 1-10)

  • TTS adoption: 20% of active users
  • Parallel view usage: 15% of sessions
  • Cross-reference clicks: 30% of verses viewed
  • Export usage: 10% of users

Phase 2B Goals (Weeks 11-18)

  • Focus mode enabled: 25% of users
  • Notes created: Average 5 per active user
  • Tags used: 40% of highlights
  • Speed reading tried: 10% of users

Phase 3 Goals (Weeks 19-39)

  • AI suggestions clicked: 30% relevance rate
  • Semantic search used: 15% of searches
  • Analytics viewed: Weekly by 50% of users
  • Social features: 20% engagement rate

🚀 Quick Start Guide

For Developers

  1. Choose your starting feature:

    • Highest user value: Text-to-Speech
    • Easiest implementation: Focus Mode Enhanced
    • Most complex: AI Smart Suggestions
  2. Review the plan:

    • Read the full implementation plan
    • Check database schema requirements
    • Review API endpoints needed
  3. Set up environment:

    # Install dependencies (if new)
    npm install <required-packages>
    
    # Update database schema
    npx prisma db push
    
    # Run migrations
    npx prisma migrate dev
    
  4. Follow the timeline:

    • Each plan has a day-by-day breakdown
    • Build incrementally
    • Test continuously

For Project Managers

  1. Resource allocation:

    • Assign developers based on expertise
    • Frontend: React, TypeScript, Material-UI
    • Backend: Node.js, Prisma, PostgreSQL
    • Full-stack: Can handle both
  2. Sprint planning:

    • Use 2-week sprints
    • Each feature = 1-3 sprints
    • Build buffer time (15-20%)
  3. Risk management:

    • Identify blockers early
    • Have fallback options
    • Regular stakeholder updates

📈 Progress Tracking

Template for Feature Implementation

## [Feature Name]

**Status:** Not Started | In Progress | In Review | Complete
**Progress:** 0% → 100%
**Start Date:** YYYY-MM-DD
**Target Date:** YYYY-MM-DD
**Actual Completion:** YYYY-MM-DD

### Milestones
- [ ] Database schema updated
- [ ] API endpoints implemented
- [ ] UI components built
- [ ] Testing complete
- [ ] Documentation written
- [ ] Deployed to production

### Blockers
- None / [Description]

### Notes
- [Any relevant notes]

🔄 Continuous Improvement

After Each Feature Launch

  1. Collect user feedback:

    • In-app surveys
    • Usage analytics
    • Support tickets
    • Feature requests
  2. Measure success metrics:

    • Adoption rate
    • Engagement
    • Performance
    • Error rates
  3. Iterate:

    • Quick wins (bug fixes)
    • Medium improvements (UX tweaks)
    • Long-term enhancements (v2.0)

Current Status Documents

Technical Documentation

  • Database schema: See Prisma schema file
  • API documentation: See individual route files
  • Component library: Material-UI v7

⚠️ Important Considerations

Before Starting Any Feature

  1. Dependencies:

    • Check if feature requires other features first
    • Verify all required packages are installed
    • Ensure database supports required features (e.g., pgvector for AI)
  2. User Impact:

    • Will this affect existing users?
    • Do we need a migration strategy?
    • Should we use feature flags?
  3. Performance:

    • What's the expected load?
    • Do we need caching?
    • Are there potential bottlenecks?
  4. Cost:

    • Any new third-party services?
    • API usage costs?
    • Storage/bandwidth implications?

🎉 Conclusion

This roadmap provides a clear path from the current state to a fully-featured Bible study platform. Each implementation plan is production-ready and can be executed independently or in parallel (where dependencies allow).

Total Estimated Timeline:

  • Fast Track (Large Team): 3-5 months
  • Moderate (Small Team): 6-9 months
  • Steady (Solo Developer): 12-15 months

Recommended Approach: Start with Phase 2 High Priority features for maximum user impact, then expand to Phase 2B for enhanced experience, and finally implement Phase 3 for advanced capabilities.


📞 Need Help?

For questions or clarifications on any implementation plan:

  1. Review the specific plan document
  2. Check the component code examples
  3. Refer to the API endpoint specifications
  4. Test with small prototypes first

Good luck with the implementation! 🚀


Maintained by: Development Team Next Review: After Phase 2 completion Version: 1.0