Includes all Phase 1 features: - Search-first navigation with auto-complete - Responsive reading interface (desktop/tablet/mobile) - 4 customization presets + full fine-tuning controls - Layered details panel with notes, bookmarks, highlights - Smart offline caching with IndexedDB and auto-sync - Full accessibility (WCAG 2.1 AA) 🤖 Generated with [Claude Code](https://claude.com/claude-code) Co-Authored-By: Claude <noreply@anthropic.com>
9.8 KiB
Biblical Guide - Complete Implementation Roadmap
📋 Overview
This document provides a comprehensive roadmap for all planned features, organized by priority, with detailed timelines and resource allocation recommendations.
Document Version: 1.0 Last Updated: 2025-10-13 Status: Master Planning Document
🎯 Implementation Plans Created
🔴 High Priority - Phase 2 (8-10 weeks)
| # | Feature | Estimated Time | Plan Document | Status |
|---|---|---|---|---|
| 1 | Text-to-Speech | 2-3 weeks | TEXT_TO_SPEECH_IMPLEMENTATION_PLAN.md | ✅ Ready |
| 2 | Parallel Bible View | 2 weeks | PARALLEL_BIBLE_VIEW_PLAN.md | ✅ Ready |
| 3 | Cross-References Panel | 2 weeks | CROSS_REFERENCES_PANEL_PLAN.md | ✅ Ready |
| 4 | Export Functionality | 2-3 weeks | EXPORT_FUNCTIONALITY_PLAN.md | ✅ Ready |
Total Phase 2 Time: 8-10 weeks
🟡 Medium Priority - Phase 2B (5-7 weeks)
| # | Feature | Estimated Time | Plan Document | Status |
|---|---|---|---|---|
| 5 | Focus Mode Enhanced | 1 week | FOCUS_MODE_ENHANCED_PLAN.md | ✅ Ready |
| 6 | Rich Text Notes | 2 weeks | RICH_TEXT_NOTES_PLAN.md | ✅ Ready |
| 7 | Tags & Categories | 1-2 weeks | TAGS_CATEGORIES_SYSTEM_PLAN.md | ✅ Ready |
| 8 | Speed Reading Mode | 2 weeks | SPEED_READING_MODE_PLAN.md | ✅ Ready |
| 9 | Custom Fonts & Dyslexia | 1 week | CUSTOM_FONTS_DYSLEXIA_SUPPORT_PLAN.md | ✅ Ready |
Total Phase 2B Time: 7-8 weeks
🔵 Future - Phase 3 (12-16 weeks)
| # | Feature | Estimated Time | Plan Document | Status |
|---|---|---|---|---|
| 10 | AI Smart Suggestions | 4-6 weeks | AI_SMART_SUGGESTIONS_PLAN.md | ✅ Ready |
| 11 | Reading Analytics Dashboard | 3-4 weeks | 📝 To be created | ⏳ Pending |
| 12 | Social & Collaboration | 4-6 weeks | 📝 To be created | ⏳ Pending |
| 13 | Enhanced Offline Experience | 2-3 weeks | 📝 To be created | ⏳ Pending |
| 14 | Advanced Search & Discovery | 2-3 weeks | 📝 To be created | ⏳ Pending |
Total Phase 3 Time: 15-22 weeks
📊 Complete Feature Matrix
By User Impact & Complexity
High Impact
│
Text-to-Speech │ Parallel View
Cross-Refs │ Export
─────────────────────────┼─────────────────────────
Speed Reading │ AI Suggestions
Analytics │ Social Features
│
Low Complexity → High Complexity
By Implementation Order (Recommended)
Quarter 1 (Weeks 1-13)
- Text-to-Speech (Weeks 1-3)
- Parallel Bible View (Weeks 4-5)
- Cross-References (Weeks 6-7)
- Export Functionality (Weeks 8-10)
- Focus Mode Enhanced (Week 11)
- Custom Fonts & Dyslexia (Week 12)
- Buffer/Testing (Week 13)
Quarter 2 (Weeks 14-26)
- Rich Text Notes (Weeks 14-15)
- Tags & Categories (Weeks 16-17)
- Speed Reading Mode (Weeks 18-19)
- Reading Analytics (Weeks 20-23)
- Advanced Search (Weeks 24-25)
- Buffer/Testing (Week 26)
Quarter 3 (Weeks 27-39)
- AI Smart Suggestions (Weeks 27-32)
- Enhanced Offline (Weeks 33-35)
- Social Features - Phase 1 (Weeks 36-39)
Quarter 4 (Weeks 40-52)
- Social Features - Phase 2 (Weeks 40-43)
- Polish & Optimization (Weeks 44-48)
- Marketing & Documentation (Weeks 49-52)
💰 Resource Requirements
Development Team (Recommended)
Option A: Single Developer
- Timeline: 52 weeks (1 year)
- Cost: Varies by region
- Pros: Consistent vision, lower coordination overhead
- Cons: Longer timeline, no redundancy
Option B: Small Team (2-3 Developers)
- Timeline: 26-30 weeks (6-7 months)
- Frontend Developer
- Backend Developer
- UI/UX Designer (part-time)
- Pros: Faster delivery, specialization
- Cons: Higher cost, coordination needed
Option C: Larger Team (4-6 Developers)
- Timeline: 13-20 weeks (3-5 months)
- 2 Frontend Developers
- 2 Backend Developers
- 1 UI/UX Designer
- 1 QA Engineer
- Pros: Fastest delivery, parallel workstreams
- Cons: Highest cost, more management overhead
Technology Stack Requirements
Infrastructure:
- PostgreSQL with pgvector extension (for AI features)
- Redis (caching, sessions)
- Cloud storage (S3/equivalent) for uploaded fonts, exports
- CDN for static assets
Third-Party Services:
- OpenAI/Azure OpenAI API (for AI features)
- Amazon Polly or Google TTS (for premium voices)
- Stripe (already configured)
- SendGrid/Mailgun (already configured)
Estimated Monthly Costs:
- Infrastructure: $50-200/month
- AI Services: $100-500/month (depending on usage)
- Storage/CDN: $20-100/month
- Total: $170-800/month
🎯 Success Metrics
Phase 2 Goals (Weeks 1-10)
- ✅ TTS adoption: 20% of active users
- ✅ Parallel view usage: 15% of sessions
- ✅ Cross-reference clicks: 30% of verses viewed
- ✅ Export usage: 10% of users
Phase 2B Goals (Weeks 11-18)
- ✅ Focus mode enabled: 25% of users
- ✅ Notes created: Average 5 per active user
- ✅ Tags used: 40% of highlights
- ✅ Speed reading tried: 10% of users
Phase 3 Goals (Weeks 19-39)
- ✅ AI suggestions clicked: 30% relevance rate
- ✅ Semantic search used: 15% of searches
- ✅ Analytics viewed: Weekly by 50% of users
- ✅ Social features: 20% engagement rate
🚀 Quick Start Guide
For Developers
-
Choose your starting feature:
- Highest user value: Text-to-Speech
- Easiest implementation: Focus Mode Enhanced
- Most complex: AI Smart Suggestions
-
Review the plan:
- Read the full implementation plan
- Check database schema requirements
- Review API endpoints needed
-
Set up environment:
# Install dependencies (if new) npm install <required-packages> # Update database schema npx prisma db push # Run migrations npx prisma migrate dev -
Follow the timeline:
- Each plan has a day-by-day breakdown
- Build incrementally
- Test continuously
For Project Managers
-
Resource allocation:
- Assign developers based on expertise
- Frontend: React, TypeScript, Material-UI
- Backend: Node.js, Prisma, PostgreSQL
- Full-stack: Can handle both
-
Sprint planning:
- Use 2-week sprints
- Each feature = 1-3 sprints
- Build buffer time (15-20%)
-
Risk management:
- Identify blockers early
- Have fallback options
- Regular stakeholder updates
📈 Progress Tracking
Template for Feature Implementation
## [Feature Name]
**Status:** Not Started | In Progress | In Review | Complete
**Progress:** 0% → 100%
**Start Date:** YYYY-MM-DD
**Target Date:** YYYY-MM-DD
**Actual Completion:** YYYY-MM-DD
### Milestones
- [ ] Database schema updated
- [ ] API endpoints implemented
- [ ] UI components built
- [ ] Testing complete
- [ ] Documentation written
- [ ] Deployed to production
### Blockers
- None / [Description]
### Notes
- [Any relevant notes]
🔄 Continuous Improvement
After Each Feature Launch
-
Collect user feedback:
- In-app surveys
- Usage analytics
- Support tickets
- Feature requests
-
Measure success metrics:
- Adoption rate
- Engagement
- Performance
- Error rates
-
Iterate:
- Quick wins (bug fixes)
- Medium improvements (UX tweaks)
- Long-term enhancements (v2.0)
📚 Related Documentation
Current Status Documents
- FEATURES_BACKLOG.md - Original feature list
- SUBSCRIPTION_IMPLEMENTATION_STATUS.md - Completed subscription system
- AI_CHAT_IMPLEMENTATION_COMPLETE.md - Completed AI chat
Technical Documentation
- Database schema: See Prisma schema file
- API documentation: See individual route files
- Component library: Material-UI v7
⚠️ Important Considerations
Before Starting Any Feature
-
Dependencies:
- Check if feature requires other features first
- Verify all required packages are installed
- Ensure database supports required features (e.g., pgvector for AI)
-
User Impact:
- Will this affect existing users?
- Do we need a migration strategy?
- Should we use feature flags?
-
Performance:
- What's the expected load?
- Do we need caching?
- Are there potential bottlenecks?
-
Cost:
- Any new third-party services?
- API usage costs?
- Storage/bandwidth implications?
🎉 Conclusion
This roadmap provides a clear path from the current state to a fully-featured Bible study platform. Each implementation plan is production-ready and can be executed independently or in parallel (where dependencies allow).
Total Estimated Timeline:
- Fast Track (Large Team): 3-5 months
- Moderate (Small Team): 6-9 months
- Steady (Solo Developer): 12-15 months
Recommended Approach: Start with Phase 2 High Priority features for maximum user impact, then expand to Phase 2B for enhanced experience, and finally implement Phase 3 for advanced capabilities.
📞 Need Help?
For questions or clarifications on any implementation plan:
- Review the specific plan document
- Check the component code examples
- Refer to the API endpoint specifications
- Test with small prototypes first
Good luck with the implementation! 🚀
Maintained by: Development Team Next Review: After Phase 2 completion Version: 1.0